Read on app Read on app
✕
Prayer Times
  • Morocco
  • Lifestyle
  • Western Sahara
  • Login
  • Register
Morocco World News
  • Home
  • Culture
  • Politics
  • Society
  • Economy
  • Opinion
  • Education
  • Sustainability
  • Tech
  • Sport
  • GITEX 2026
No Result
View All Result
Morocco World News
  • Home
  • Culture
  • Politics
  • Society
  • Economy
  • Opinion
  • Education
  • Sustainability
  • Tech
  • Sport
  • GITEX 2026
No Result
View All Result
Morocco World News

Home > Headlines > ONCF Invests MAD 37.3 Million to Secure Pipeline Ahead of Kenitra–Marrakech High-Speed Rail

ONCF Invests MAD 37.3 Million to Secure Pipeline Ahead of Kenitra–Marrakech High-Speed Rail

The project will span around 10 months and involve the diversion and reinforcement of 14-inch fuel pipelines intersecting the future Kenitra–Marrakech high-speed rail route.

Oumaima Moho AmerbyOumaima Moho Amer
Dec, 27, 2025
0 0
A A
ONCF

ONCF

Follow the latest news from Morocco World News

Join on WhatsApp Join on Telegram

Mohammedia – Morocco’s national rail operator, ONCF, has launched a new infrastructure project valued at MAD 37.3 million as part of preparations for the future high-speed rail line linking Kenitra to Marrakech, a flagship extension of the country’s LGV network.

The investment targets a highly technical yet essential operation involving the diversion and reinforcement of a 14-inch fuel pipeline, as well as the securing of adjacent fuel reserves that currently intersect with the planned route of the high-speed line.

These installations are historically linked to SAMIR, whose infrastructure remains embedded in several strategic corridors despite the refinery’s shutdown.

According to project details, the works will ensure full compatibility between existing energy infrastructure and the future rail platform, while meeting safety, durability, and regulatory requirements.

The contract covers engineering studies, technical supervision, supply of materials and equipment, and the execution of civil works needed to adapt the pipeline to the new railway layout.

The project is scheduled to span approximately 10 months, with construction phased to minimize disruption.

Initial works will focus on two sensitive crossing points near road RR313, where pipeline sections measuring around 848 meters and 574 meters will be diverted.

Subsequent stages will complete the remaining rerouting and reinforce protection systems to safeguard both the pipeline and the rail infrastructure over the long term.

This intervention forms part of a broader series of adjustments required before the LGV Kenitra–Marrakech enters full construction.

While less visible than track laying or station development, such operations are considered critical to avoiding future technical conflicts and ensuring the reliability of strategic networks that coexist along the corridor.

Read also: ONCF Mobilizes Exceptional Train Services for Fans During AFCON 2025

Tags: LGV MoroccoONCF train
TweetShareShareSendShareScan

USEFUL LINKS

  • About
  • Privacy Policy
  • Contact
  • Careers
  • Terms Of Use
  • Cookies Policy

TOPICS

  • Mawazine 2025
  • Environment
  • Politics
  • Lifestyle
  • Sports
  • Western Sahara

REGIONS

  • International
  • Maghreb
  • Middle East
  • Africa

Download our App


Download the Morocco World News app on Google Play for Android

Download the Morocco World News app on the Apple App Store for iPhone and iPad

Copyright 2026 Morocco World News. All rights reserved. Morocco World News is not responsible for the content of external sites.
Read about our approach to external linking.

Welcome Back!

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Fill the forms below to register

*By registering into our website, you agree to the Terms & Conditions and Privacy Policy.
All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
  • Login
  • Sign Up
No Result
View All Result
  • Home
  • Culture
  • Politics
  • Society
  • Economy
  • Opinion
  • Education
  • Sustainability
  • Tech
  • Sport
  • GITEX 2026

Useful Links

  • Prayer Times

Useful Links:

  • Prayer Times

All Right Reserved © 2025 Morocco World News .

Contact us