Read on app Read on app
✕
Prayer Times
  • Morocco
  • Lifestyle
  • Western Sahara
  • Login
Morocco World News
  • Home
  • Culture
  • Politics
  • Society
  • Economy
  • Opinion
  • Education
  • Sustainability
  • Tech
  • Sport
  • GITEX 2026
No Result
View All Result
Morocco World News
  • Home
  • Culture
  • Politics
  • Society
  • Economy
  • Opinion
  • Education
  • Sustainability
  • Tech
  • Sport
  • GITEX 2026
No Result
View All Result
Morocco World News

Home > Headlines > Sound Energy to Resume Gas Workover Operations in Tendrara

Sound Energy to Resume Gas Workover Operations in Tendrara

Sound Energy, the UK-based transition energy company, announced today that it will resume gas workover operations in Tendrara.

Firdaous NaimbyFirdaous Naim
Aug, 15, 2024
0 0
A A
Sound Energy to Resume Gas Workover Operations in Tendrara

Sound Energy to Resume Gas Workover Operations in Tendrara

Follow the latest news from Morocco World News

Join on WhatsApp Join on Telegram

Rabat – Sound Energy, the UK-based transition energy company, announced today that it will resume gas workover operations in Tendrara. 

This follows the company’s update from June 25 this year. 

The focus will now be on the gas well TE-7, according to the company’s statement, as preparations continue for its long-term production into the micro-LNG plant being constructed on site. 

The work will also involve running new completion tubing into TE-7 using the Star Valley Rig 101, which has been stationed at the Tendrara Production Concession at no extra cost to the Group while waiting for additional wellhead equipment. 

In June, the company successfully removed the existing completion tubing from both TE-6 and TE-7 and then installed new corrosion-resistant completing tubing in TE-6.

Once the additional well surface equipment is imported, a similar operation will be carried out at TE-7. 

Read Also: Nigeria-Morocco Gas Pipeline Project Gains Momentum Following High-Level Talks

The gas development plan for the Tendrara exploitation project is designed in two phases.

The first phase, currently under construction, aims to produce 100 million cubic meters of liquefied natural gas (LNG) annually starting in mid-2025.

This phase will involve the installation of on-site gas treatment, liquefaction, and storage facilities, intended to meet the needs of national industrial consumers.

The second phase, which is currently in the feasibility study stage, includes plans for building a processing unit and a pipeline connecting to the Maghreb-Europe Gas (GME) pipeline.

In 2022, Sound Energy announced an agreement with Morocco’s Hydrocarbons and Mines Office (ONHYM) concerning the GME project. 

The agreement, which pertains to the second phase of the Tendrara project, involves ONHYM’s approval for connecting the Tendrara Production Concession to the Maghreb-Europe pipeline through a gas export spur pipeline.

The pipeline will run along the West African coast from Nigeria through 13 African countries, connecting to the European market via Spain, and is expected to supply 280 million cubic meters of natural gas per year. 

The GME also promises considerable economic benefits such as job creation and industrial development, positioning Morocco as a pioneer in green hydrogen. 

The Tendrara Production Concession project was officialized in September 2018 and is located for access to the GME pipeline approximately 120 kilometers to the North. 

Tags: Gas Pipeline ProjectMorocco Gas Concession
TweetShareShareSendShareScan

Recent News

African football has made a historic achievement, with nine of the ten national teams reaching the knockout stage at the 2026 FIFA World Cup.

Africa Makes History: Nine Teams Reach World Cup Round of 32

June 28, 2026
Dave Patera Sharing Moroccan Cuisine with the World / MWN Design Team Courtesy of Dave Patera

MasterChef’s Dave Patera Finds Home in Maghrebi Food

June 28, 2026
Hamdallah Joins Al-Taawoun on One-Year Deal After Al-Shabab Exit

Hamdallah Joins Al-Taawoun on One-Year Deal After Al-Shabab Exit

June 28, 2026
Boulos Says Polisario’s Claims About His Departure as Advisor Are Deliberate Falsehoods

Boulos Says Polisario’s Claims About His Departure as Advisor Are ‘Deliberate Falsehoods’

June 28, 2026
Arab Parliament Commends King Mohammed VI’s Role in Defending Jerusalem

Arab Parliament Commends King Mohammed VI’s Role in Defending Jerusalem

June 28, 2026

USEFUL LINKS

  • About
  • Privacy Policy
  • Contact
  • Careers
  • Terms Of Use
  • Cookies Policy

TOPICS

  • Mawazine 2025
  • Environment
  • Politics
  • Lifestyle
  • Sports
  • Western Sahara

REGIONS

  • International
  • Maghreb
  • Middle East
  • Africa

Download our App


Download the Morocco World News app on Google Play for Android

Download the Morocco World News app on the Apple App Store for iPhone and iPad

Copyright 2026 Morocco World News. All rights reserved. Morocco World News is not responsible for the content of external sites.
Read about our approach to external linking.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
  • Login
No Result
View All Result
  • Home
  • Culture
  • Politics
  • Society
  • Economy
  • Opinion
  • Education
  • Sustainability
  • Tech
  • Sport
  • GITEX 2026

Useful Links

  • Prayer Times

Useful Links:

  • Prayer Times

All Right Reserved © 2025 Morocco World News .

Contact us
Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?